Home · Skills · Capital Project Intake And Prioritization
Back to all skills

Capital Project Intake And Prioritization

Intake for capital project ideas from any source (PM, regional, AM, engineering, capex plan cycle). Scores each project against the overlay's priority rubric (life safety, deferred maintenance, renovation yield, risk mitigation, regulatory). Produces the prioritized backlog and flags gated decisions.

What this skill does

Capital Project Intake And Prioritization is an A.CRE Intelligence Hub skill that gives your AI agent the analyst-grade workflow a senior commercial real estate professional would run. Intake for capital project ideas from any source (PM, regional, AM, engineering, capex plan cycle). Scores each project against the overlay's priority rubric (life safety, deferred maintenance, renovation yield, risk mitigation, regulatory). Produces the prioritized backlog and flags gated decisions. Intake for capital project ideas from any source PM, regional, AM, engineering, capex plan cycle . Scores each project against the overlay's priority rubric life safety, deferred maintenance, renovation yield, risk mitigation, regulatory . Produces the prioritized backlog and flags gated decisions. Activate it inside ChatGPT, Claude, Manus, or OpenClaw by saying something like "Use the Capital Project Intake And Prioritization skill" — the Hub routes the request to this skill and the underlying primary-source CRE data feeds backends automatically.

How you'll use it

"Use the Capital Project Intake And Prioritization skill"

Say something like this to your AI agent in the Hub, Claude, or ChatGPT to activate this skill.

Skill activation rules

Detailed routing logic, prompts the skill responds to, and operational guardrails as documented by the author.

Intake for capital project ideas from any source (PM, regional, AM, engineering, capex plan cycle). Scores each project against the overlay's priority rubric (life safety, deferred maintenance, renovation yield, risk mitigation, regulatory). Produces the prioritized backlog and flags gated decisions.

What's inside

Capital Project Intake and Prioritization

Workflow purpose

Convert raw capex ideas and deferred-maintenance flags into a ranked, costed, approvable backlog. Ensures life-safety items never lose priority; routes scope deferrals for approval.

Trigger conditions

Show full previewShow less

Capital Project Intake and Prioritization

Workflow purpose

Convert raw capex ideas and deferred-maintenance flags into a ranked, costed, approvable backlog. Ensures life-safety items never lose priority; routes scope deferrals for approval.

Trigger conditions

  • Explicit: "capex intake", "prioritize capex", "capex backlog", "year-end capex plan".
  • Implicit: workflows/monthly_property_operating_review surfaces deferred maintenance; workflows/work_order_triage finds a repeat pattern; insurance claim or inspection produces a scope.
  • Recurring: quarterly intake; annual plan build pre-budget.

Inputs (required / optional)

Full instructions and any reference files ship in the .skill bundle.

Bundle structure
capital-project-intake-and-prioritization/
└── SKILL.md                                # Required: instructions + metadata

Who built it

With contributions from Avi Hacker.

How to run it

Not in the Hub? Download the .skill bundle above and follow the A.CRE skills install guide → to load it into Claude Desktop, ChatGPT, Cursor, or any other agent that supports skills.

Already in the Hub. If you're an AI.Edge Pro or A.CRE Accelerator member, this skill is bundled into the A.CRE Intelligence Hub direct connector (MCP server) — just ask your agent.

About this skill

Third-Party skill. This skill is redistributed under the Apache-2.0 license and is not authored or endorsed by Adventures in CRE. Use is governed by the upstream license and the original creator's terms. Original attribution: Mario Urquia (link) and contributors (Avi Hacker).